Bread for the World - Protestant Development Service is the globally
active development and relief agency of the Protestant Churches in
Germany. In more than 90 countries all across the globe we empower the
poor and marginalised to improve their living conditions.
CONSULTANT - EVALUATION OF AN INTEGRATED COMMUNITY BASED DEVELOPMENT PROGRAMME
PROJECT NUMBER: A-NGA-2016-1020
Organisation: EYN (Ekklesiyar Yan'uwa a Nigeria) - Church of the Brethren in Nigeria
INTRODUCTION/BACKGROUND OF THE PROGRAMME
The
Church of the Brethren Mission in Nigeria was founded in 1923 by two
American Brethren: H. Stover Kulp and Albert D. Helser. It is the
largest national body of the Church of the Brethren in the world. With a
vibrant history of more than 90 years, EYN has placed a high emphasis
on education, health, and agriculture.
Today EYN is being ravaged by
attacks from the militant group Boko Haram. Before the destruction by
insurgents, EYN had nearly a million people attending services. EYN is a
member of the World Council of Churches and the Christian Association
of Nigeria. Its Headquarters are based in Kwarhi/Mubi, Adamawa State.
The
EYN Integrated community development programme (ICBDP), which is also
based in Kwarhi, is an arm of EYN working to holistically empower rural
communities and transform them through a participatory process towards
self-reliance and to sustain the services through capacity building of
staff and the securing of sufficient financial means. Bread for the
World - Protestant Development Service collaborates with EYN-ICBDP since
1985. Currently, it is the only donor organization for the programme.
The
overall goal of the current project is to contributes to strengthen the
rural communities against the background of the current crisis in the
project region
SPECIFIC PROJECT OBJECTIVES
Self-help capacities and social cohesion among the rural communities is strengthened by the end of 2017
Food security of the rural communities is improved
The agreed indicators to measure the extent of achievement of the above mentioned objectives are:
For project objective 1:
The
rural population of 54 communities has analyzed and prioritized their
basic needs in local development plans and has started the
implementation of the plans.
The existing conflicts in the
communities have been discussed with the rural population and
peace-building strategies have been developed.
The rural population of 54 communities has dealt with their personal traumas.
For project objective 2:
3240 households in 54 communities have stabilized their crop yields on the level of the harvest in 2014.
Target groups and operational area
The
Programme's target groups are poor and neglected rural communities in
all their facets and subgroups are children, women, men, disabled and
the vulnerable, irrespective of religion, ethnicity and race.
In the
operational areas of EYN Integrated Community Based Development
Programme currently comprises 8 Local Government Areas (LGAs) - 5 in
Adamawa State, and 3 in Borno State covering total communities of 54
communities. In general, the operational area of the ICBDP can be
defined as southern Borno and northern Adamawa States. The project
targeted to meet 25, 920 direct and indirect beneficiaries, at an
average percentage of 60% women and 40% men respectively. About 30% of
the target groups are Muslims.
Political context and current situation in the project area:
In
the last several years, nearly 70 percent of the EYN church buildings
were lost (1,668 churches burned or abandoned), the EYN headquarters
were overrun, more than 11,000 EYN members have been killed, thousands
have been kidnapped including the Chibok girls, and hundreds of
thousands are still displaced. Even with improved security in the second
half of 2015, millions of both Christian and Muslim families are
impacted and terrorized by this crisis. Since then, families from
Ekklesiyar Yan'uwa a Nigeria (EYN, Church of the Brethren in Nigeria)
and their neighbors have started the long journey to recovery and return
of self sufficiency.
As at the moment, the project area is
experiencing relative peace as the security has now captured the
stronghold of boko haram (Sambisa Forest). But there is still attack and
fear in other areas of North East. The government is working hard to
help refuges in IDP camps with basic needs and most importantly
relocation to their homes. Though motorcycle is still banned by
government, some remote communities could use motorcycle for conveying
their goods.
The major challenges generally faced in the country as
regards to economics recession is the increase in prices of goods and
services which still have an impact on the livelihood of our target
population. Specifically, most schools have increased the school fees,
transportation cost, increase in food prices and other commodities.
CAUSE AND OBJECTIVE OF THE EVALUATION
The current project started on 1st January 2016 and will end on 31st December 2017.
The
evaluation was initiated by Bread for the World - Protestant
Development Service and scheduled at the beginning of the second year of
implementation in order to provide a substantial assessment of the
project with regard to a possible continuation of the project after
2017.
The overall objective of the evaluation is to carry out a
participative examination of the impact and effectiveness of EYN-ICBDP's
activities, approaches and its organizational structure in the
implemented project.
DETAILED OBJECTIVES OF THE EVALUATION ARE:
To
assess the performance of the programme based on the agreed objectives
and indicators indicated in the cooperation agreement and project
application form as well as to assess the effectiveness and impact of
its activities on various aspects of the project and other indirect
beneficiaries
To identify and document lessons learnt and faced challenges
To analyse the strength, weaknesses, opportunities and constraints of the organization (EYN-ICBDP)
To examine the management (Structure and procedure) of EYN-ICBDP
To
learn on how to improve future implementation, to give recommendations
based on findings and provide relevant information for the development
of a possible next phase of the project.
The evaluation is intended
to assess the relevance, effectiveness, efficiency, impact and
sustainability of the project. It looks at signs of potential impact of
project activities on various aspects of the project and other indirect
beneficiaries.
Key Questions
The guiding evaluation questions
are based on the 5 DAC Criteria. Please find a detailed list of
questions below. In addition to that, it is expected that the evaluation
team compiles a detailed description of approach, conducted activities
related to the different project objectives.
Relevance:
Did we
plan the right thing? Do we do the right thing? To what extent are the
objectives, planned activities and planned outputs consistent with the
intended outcome and impact? Are there differences between the time when
the programme/project was designed and today?
To what extent are the objectives of the project/programme still valid?
With
regard to the overall situation in the project region, is the focus on
activities related to Community Development - as opposed to activities
related to Agriculture or Rural Health - well chosen?
Effectiveness:
To what extent the objectives of the project/programme will be achieved?
What are the short or intermediate-term medium term (intended or unintended) outcome of the programme/project?
To what extent could the selected target group be reached?
To what extent women are addressed in the project?
In
how far are included Muslims and Christians into the project? How
exactly the project staff is working with the/ bringing them together?
What is the approach of the project?
What were the major factors influencing the achievement or non-achievement of the objectives?
Efficiency:
Will the objectives be achieved in an economically viable manner?
Were activities cost-efficient?
Was the programme or project implemented in the most efficient way compared to alternatives?
Is there a good relation between admin staff, programme staff and field staff working for ICBDP?
How
did the different departments and ministries of EYN (e.g. peace
building desk, Ministry for Emergency response, EYN Ressource and
Competence Centre) work together?
Impact:
Will the project /
programme contribute to the attainment of overall development goals?
Additionally, whether and, if so, which other positive and negative
changes have occurred will be investigated.
What has happened as a
result of the programme or project? (Intended and unintended impacts,
equal opportunities for women and men, improvement of social and
economic infrastructure, poverty reduction, cross sectoral impact or
other relevant cross-cutting issues).
Sustainability:
To what
extent will the positive impacts or changes of the programme/project
(are likely to) continue beyond the end of the project period?
Which measures are implemented in order to support sustainability?
What were the major factors which influenced the achievement or non-achievement of sustainability of the programme or project?
To
what extent the project collaborates with other relevant stakeholders
to strengthen the sustainability of the achievements of the project?
Additionally,
there should be an assessment of the programme's structure including
financial management, procedures and standards, M&E system and human
resource recruiting policy .
Evaluation Design/Methods
The evaluation is to be conducted in line with the OECD/DAC standards.
Bread
for the World - Protestant Development Service is not committed to any
specific evaluation method, but endeavors - in dialogue with the
evaluators and the other parties involved - to ensure the appropriate
evaluation design and the best possible choice of methods for evaluating
the object in question.
Methods applied must be participatory,
appropriate for viable data collection, displaying and respecting
different views. Methods should enhance joint learning of all actors
implied. The gender perspective should be systematically integrated in
the methodology.
Possible methods/procedures include the following:
Review of project files, especially reports, evaluation reports etc.
Interviews
and dialogues with involved stakeholders and project beneficiaries at
different levels (such as such as ICBDP Board members, Community
Development Committee (CDC), Community members, ICBDP staff and
management, women representatives, community representatives
Interviews and research for context description
On-location visits
SWOT Analysis of ICBDP
Process of the Evaluation/ Time Frame
Deadline Tender: 12 March, 2017
Selection of evaluator: End of March, 2017
First
kick off meetings to clarify contract details, inception report,
analysis of documents and interview in Germany: Mid of April, 2017
A
one day organizational assessment workshop with ICBDP staff, Board
members and selected beneficiaries to clarify the ToR of the evaluation,
to clarify mutual expectations, to assess the organization, to clarify
last details and logistic arrangements for field visits: Two days before
the field visits commence (8 and 9 May, 2017)
Field mission, fact
finding at 4 communities (the selection of the communities will be made
by the evaluation team in discussion with ICBDP staff, considering among
others the following criteria: Accessibility of the communities, Fair
affiliation to different project zones: 10th - 21th May, 2017
De-briefing with ICBDP staff: End of May, 2017
Draft report: Mid of June, 2017
Presentation of findings and recommendations in Nigeria and Germany: End of June, 2017
Final version of the report: Mid of July, 2017
Expected products
Inception Report:
The inception report should be prepared after the kick-off meeting, first interviews and a studying of key documents and state:
If the objectives of the evaluation can be reached, possible restrictions and additional issues and questions
Which methods and instruments will be used
Which products will be presented
Which kind of support will be needed
Samples of interview guides.
The inception report must be written in English and be accepted by Bread for the World - Protestant Development Service.
Draft Report and Presentation:
After
presentation of the draft report to EYN-ICBDP staff and Bread for the
World - Protestant Development Service, both stakeholders have the
possibility to give feedback on the draft report. The evaluators are
obliged to revise the draft report accordingly.
Final Report:
The
draft and final report should be written in English and should not
exceed 40 pages plus annexes and respect the quality criteria which will
be combined between the evaluator and Bread for the World - Protestant
Development Service. A sound description of the project, detailing the
approach itself - the instruments, the principles, the critical
circumstances, etc. should be part of the report.
Key qualifications of the evaluators
The
evaluation is to be conducted by an evaluation team comprising of one
international and one local consultant. The local consultant already was
appointed by EYN-ICBDP. To complement the qualifications of the local
consultant, the international consultant should possess the following
qualifications:
Be an agricultural expert, horticulturist or expert in an akin field
Have experience working with civil society structures in Africa, experience with church structures is an asset
Have extensive experience with evaluations
TO APPLY
Applicants should send the following below to "Matthias Magnussen (Project Officer West and Central Africa Desk) via: Matthias.Magnussen@brot-fuer-die-welt.de
Required Documents
CV of the evaluator
Technical
/ specific proposal: "Outline of the planned evaluation procedure";
"short explanation and justification of the methods to be deployed
considering relevant cross-cutting issues".
Financial proposal:
Complete cost estimate that includes both, the fee as well as any
ancillary costs to be incurred, such as transport, accommodation, taxes,
fees and costs of workshops in the scope of the evaluation etc. All
incurring costs of the local evaluator will be covered by a separate
budget.
DUE DATE: 12 March, 2017
Consultancy Role at Bread for the World
Like This Post? Please share!
0 comments:
Post a Comment